Concrete Patios & Stairs in Carnation, WA

Grade drives most of the design for a Carnation patio. The drainage permit leaves out single-family work, but the standards still ask each lot to handle its own runoff, so we set the fall and the roof-water route before anything else.

Patio and steps cross-sectionA concrete patio slopes away from the house on a compacted base and ends in steps with equal risers. 12345
Patio section: sloped away from the house, ending in steps
  1. Surface slopes away from the house and foundation
  2. Broom, aggregate, or stamped finish with a slip-resistant sealer
  3. Compacted rock base under the slab
  4. Steps with equal risers, built to code dimensions
  5. Foundation and footing, kept clear of pooling water

Patios & stairs in Carnation: what to know

Carnation’s drainage permit covers new or replaced impervious surface of 2,000 square feet or more, and it excludes single-family residential development. A house-lot patio therefore falls outside that permit. The standards still require best management practices for development activity even when no permit is needed, so the runoff plan for the slab is part of the job either way. We slope the slab off the foundation and divert roof water before it reaches the concrete.

The Storm Sewer Standards separately apply to new projects that add 1,000 square feet or more of impervious surface, and that sentence does not name single-family work. We confirm with the City Engineer how the threshold reaches a patio on a house lot, because the standards say interpretation questions may be directed to that office. The city has no storm network for runoff from outside its existing tributary areas, so the slab has to drain to ground on your own lot.

Permits and rules in Carnation

Before any quote goes out, we confirm with the City Engineer whether the 1,000 square foot threshold reaches a single-family patio. The lot runoff plan and the roof-water route get checked before the slab is set. Steps are not among the exempt items we checked, so we confirm the permit path for any stair or raised landing for your address before the forms go in. We also check the exempt-work list for your address before the pour.

Rules change and vary by parcel, so we confirm the current requirements with the city before we start.

How we approach it

  • Set the fall of the slab before the layout is drawn
  • Route roof water off the surface to ground on your own lot
  • Confirm the 1,000 square foot storm threshold with the City Engineer
  • Confirm the permit path for any stair or raised landing before forms go in

For the full process, see our Concrete Patios & Stairs page.

Building in the cold months? See our guide to winter concrete pours.

Our patios & stairs work, serving Carnation

Examples of our work. We build patios & stairs in Carnation and the cities around it. See all of our work

Questions from Carnation homeowners

Would a patio on a Carnation house lot trigger the drainage permit?

Typically not. The drainage permit leaves out single-family residential development, which moves the question to the 1,000 square foot storm threshold and the lot’s runoff plan. We confirm that reading with the City Engineer before we quote.

What keeps rain from collecting on a Carnation patio?

Grade comes first: the slab drops off toward the lawn, roof water leaves the surface before it reaches the concrete, and a low corner gets an outlet on the lot. We settle those three points before the pour.

Is a poured stair workable on a sloped Carnation lot?

Yes, provided the ground checks out. Steps need a firm base, equal risers, and a landing that sheds water. If a cut or fill behind the steps is held back by a wall, that wall gets its own height check before we design it.

Other work in Carnation

The same service nearby

Talk to us about your project

Call or email us. We’ll talk through the work and set up a time to see the site.

Call 206-483-5334Get a quote